Page tree

After you have switched to Hot Standby failover mode and updated the configuration on the Hot Standby server, check that the system runs correctly.

  1. Open Prinergy Workshop and run a test job.
  2. If an InSite Prepress Portal or InSite Storefront server was connected to the Prinergy primary server, log on to InSite to verify that the server is successfully redirected to the Hot Standby server.
  3. If RBA is used and external processes or scripts are used to send remote triggers to it, ensure that they are being received and that the associated rules are being invoked.
  • No labels