Page tree

Before the Prinergy system can start processing jobs in failover mode, you must fail over to the EPM server by switching it to primary server mode, and update the JTPs, process templates, mark sets, ICC profiles, and fonts.

  • Failing over to the EPM server
    Switch the EPM secondary server to operate as the Prinergy primary server.
  • Updating the EPM setup
    Before the Prinergy system can start processing jobs in failover mode, you must check and update the failover preparations.
  • Updating the Workshop software
    The first time that you log on to a Prinergy Workshop client workstation after the system is switched to EPM failover mode, you must change the server selection.
  • Verifying system operation
    After you have switched to EPM failover mode and updated the configuration on the EPM server, check that the system runs correctly.
  • No labels