Page tree

After the EPM server is reverted to being a secondary server, start up the Prinergy software.

  1. Start Prinergy on all servers.
  2. On the primary server, verify that Prinergy is operating correctly and that the most current jobs are intact.
  3. If an InSite Prepress Portal, InSite Storefront server, Creative Workflow server, or Business Link server is connected to the Prinergy primary server, start the server and verify that the software is operating correctly.
  4. If you exported any jobs from the EPM server, start Prinergy Workshop and import the jobs so that they become part of the primary server's database: File > Import Job.

Prinergy is now restored to normal operating mode and can be used in its standard configuration.

  • No labels