  • Failing over to the Hot Standby server—switch the Hot Standby secondary server to operate as the Prinergy primary server.
  • Updating the Hot Standby setup—before the Prinergy system can start processing jobs in failover mode, you must check and update the failover preparations.
  • Updating the Workshop software—the first time that you log on to a Prinergy Workshop client workstation after the system is switched to Hot Standby failover mode, you must change the server selection.
  • Verifying system operation 1—after you have switched to Hot Standby failover mode and updated the configuration on the Hot Standby server, check that the system runs correctly.